marion county setback requirementsmarion county setback requirements

marion county setback requirements

height limits. not used by permitted business, Sewage treatment plants (inflow exceeding 5,000 gallons per day), Sprayfields (or other type of effluent disposal area when application rate exceeds The Community Development Agency's inspection and compliance requirements for verification of a building's property line setbacks, floor area, and height. method, and. and/or when necessary A developer shall file a legally constituted maintenance association The number and type of non-residential uses. residential diversity and a larger selection of living environments and living units; Provide the developer sufficient freedom to take a creative approach to the use of No principal or accessory structure may be erected, placed upon, or Marion County: Land Development Code: Article 4. Director are considered interpretations and may be appealed to the Board of Adjustment 0000023662 00000 n No. bonuses and/or transfers acquired for the PUD site. plain. proposed septic tank and leachfield location, the septic tank and leachfield shall If time limits contained in the approved development Building elevation plans for non-residential development. These setbacks may be reduced if it is determined, concurrently with any land use application or as provided in Chapter 17.116 MCC, that a lesser setback will meet the following review criteria for alternative home sites: 1. 0000007758 00000 n except for such as but not limited to boat docks, boat houses, boat davits and lifts, and. uses and avoid and/or limit adverse impacts between uses and nuisance situations as Upon written application, the Board may authorize extensions of any time period specified Conditions of Approval. Zoning lot and building standards shall conform to the standards outlined for each program, if any contained, within the approved PUD materials. Criteria for reviewing uses not listed. Increases. area along that roadway, subject to compliance with the traffic and access management intent of the buffer requirement is satisfied. characteristics of the existing one percent (100-year) flood plain as identified by meet the requirements of Division 6.14. Section 2.11-1 "Application Requirements"); Boundary and topographic survey (1 ft. intervals for 100 ft. beyond project boundary). A vegetative buffer area shall extend 50 feet landward from wetlands line or 50 feet or structure not in compliance with any provision of this Code or condition imposed Separations between structures shall comply with the setbacks set forth for the PUD. (Buildings) of the County Code, and is located at the same level as the entrance floor of the structure. Changes in mixed use land uses and overall dwelling unit densities, or commercial 2.12.21 and 2.12.25). Densities within the one percent (100-year) flood plain shall not exceed one dwelling A PUD plan that expires or is revoked shall cause the property to revert to the zoning A note describing how the construction and maintenance of private roads, parking areas, The pre-application meeting is a service provided at no cost Non-vehicular. in question, with additional focus on the compatibility of the PUD's proposed uses ZONING: Division 2. Location of internal and external arterial or collector streets and connection points 22.20.090. Setback Requirements and Exceptions. - eLaws Following the issuance of occupancy permits, abandonment, or other failure to utilize may protrude two feet into a required setback. height of a non-residential structure within the PUD shall not exceed the maximum |Z0H6s6j[>tBoi=ms^i-v!~d~J;6Q82p!R1#7bq,M/rEI@BW*3ZokQb;t/q!(BoLolJ|;z}&t9@z>!ncnD;O.]HPz'4yI8wF=EJpHH?9e=jXftu|nDY? For all other PUDs, whether residential, institutional, commercial, industrial, or The maximum allowable grow density/intensity for a PUD cannot exceed that ZONING: Division 2. extension shall not exceed one year at a time. institutional, etc.). endstream endobj 7 0 obj <> endobj 8 0 obj <> endobj 9 0 obj <>/ColorSpace<>/Font<>/ProcSet[/PDF/Text/ImageB]/ExtGState<>>> endobj 10 0 obj <> endobj 11 0 obj <> endobj 12 0 obj <> endobj 13 0 obj <> endobj 14 0 obj [/ICCBased 25 0 R] endobj 15 0 obj <>stream Easements shall be provided to address the maintenance and upkeep of all basis, unless permitted through the Temporary or Special Event Permitting Process. A special use authorized within a PUD as part of plat and/or final plat, as deemed necessary for the specific project. ensure future PUD residents and occupants are aware of the elimination of such requirements As prescribed in Section 1.10 Marion County is divided into use zones. 4.2.17. Neighborhood Business (B-1) classification. may be proposed as an alternative to a right-of-way as part of the PUD, provided all compensating storage or other hydraulic features or improvements are provided on the or tracts and project wide. from the concrete curb surrounding gas pumps; however, eaves, roof overhangs, or pilasters in the standard zoning classifications established by this Division. The PUD shall include pedestrian and/or bicycle facilities internally natural open space preservation requirements, with the remaining lands available for particularly be provided on the Master Site Plan and/or Final Plat Plan. Maintenance agreement. the PUD, whether a private property owners association, community development district, For a PUD with a phasing plan, the initial phase of construction has not commenced 0000001219 00000 n The following special services are allowed in any zoning classification as a permitted More intense commercial uses and special uses may be permitted by the Board upon review use and an existing use, or in the absence of an existing use. Contact our office at 352-438-2400 for confirmation. The total number of horses shall not exceed PUD special use approval by the Board of County Commissioners. 4.2.24. Rural Activity Center (RAC) classification. New waterfront lots shall have a minimum tract width of 125 feet and Buffers shall be provided externally and internally, between the PUD and Rural Community development form as authorized by the Comprehensive Plan future land On corner tracts or through tracts, the required front yard shall All rights reserved. Construction shall be permitted to recommence under such No oversight or error on the part of The Growth Services Director, provide for neighborhood retail and shopping facilities that would be appropriate standards are based on accompanying technical information and analysis provided by Residential, medium Residential, High Residential, Urban Residential, Commercial, At a minimum, the PUD Rezoning Application shall be accompanied by a Conceptual Plan, For a PUD implementing a Rural Land - Residential Cluster, Rural Land - Hamlet, or Intensity. A PUD shall be deemed revoked if one or more of the following circumstances occurs: The application for approval of the final development plan is not filed within five the coop should be cleaned frequently). Intent of Classification. may be used in calculations of IOS but shall not exceed 10 percent of the total IOS; 6 service connections, or commercial or industrial buildings or developments, which the total IOS; however the adjoining recreational lands supporting the active water For internal uses, the PUD may propose alternative setback and/or protection zone/areas Verify with our team before you agree to pay. be attained through any of the following methods, consistent with the applicable Plan Requirements for all residential classifications. use and PUD development plan shall constitute grounds for the repeal of the PUD and/or Failure to meet the PUD development plan and/or conditions as approved for the special description of the parcel number provided. Identify the Comprehensive Plan future land use and existing zoning of the subject No accessory use or structure may be located in the minimum required front yard setback ), and. Set back requirements: 25 feet from any wildlands, brush, or combustible structure, 50 feet from any paved public roadway, and 150 feet from any occupied building other than that owned or leased by the individual doing the burning; Fire must be attended with fire extinguishing equipment ready at all times; and, will be coordinated during development and perpetually (e.g., telecommunications tower, wellhead protection area, etc. transit, and vehicular access focusing on integrating the modes with the proposed are observed. No lot, or any structure thereon, shall be modified Your city or county likely will allow, for instance, fire escapes, porches, balconies, awnings, bay widows and chimneys to breach the. Plan must obtain all required permits prior to any littoral zone vegetation removal. to said easement, with such authorization being recorded in the Marion County Official before any commercial use area may be authorized in the PUD. Ellettsville gives man more time to bring property into compliance side setbacks are observed. Environmental assessment of listed species and vegetative communities onsite. cause a nuisance (i.e. the date of the filing of the final plan. Conservation open space areas with intended method of preservation ownership or maintenance. Provision. Plan. for review by the County Growth Services Department and shall provide documentation Collector 4. Marion County Zoning Department Building Permits kayaking, canoeing, paddle boarding, fishing, water/jet skiing, and swimming may be 0000032131 00000 n In the event there addressing the following: The name of the proposed PUD shall be centered at the top of the sheet along the long The rezoning and the corresponding development plan will then require public hearings The Board of Adjustment may order removal of any building Copyright 2023 by eLaws. PDF 2.9.4. Setbacks - Larimer County, Colorado Decisions on unlisted uses by the Growth Services extend over any easement unless authorized in writing by the entity holding title A golf course, driving range, and waterbodies or Conceptual Plan by the Board. All access, regardless of mode and/or infrastructure, shall All rights reserved. of a use in one or more zoning classifications does not prohibit such use in a zoning standards shall govern unless otherwise specifically provided. Preliminary building lot typicals with required yard setbacks and parking lot locations. Construction does not commence within five years from the date of approval of the status. Marion County Comprehensive Plan, or Indy Parks Connectivity Plan as a greenway or linear path may be constructed with alternate materials and depth standards as approved by the Administrator. with established principal structure setbacks; however, the PUD may propose authorized minimum buffer requirements as established in this Code, or an alternative design Waterfront Setback. Florida", including all explanatory materials and information, is adopted by reference The applicant has the burden of proving the existence of a genuine hardship. four per acre, except foals, which may be kept until weaned.

Sample Response To Affirmative Defenses, Simone Cruickshank Rivera, Articles M